• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Building Construction

Building Construction
In jack arch floor, the rise is kept

1/8th of the span
1/12th of the span
1/10th of the span
1/6th of the span

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The Auger borings are not common

None of these
In cohesive soils
In soils that require lateral support
In soft soils

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In verandah (corridor) floors outward slope is

1 in 60
1 in 40
1 in 70
1 in 50

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The vertical sides of a door and window openings provided in a wall, are known as

None of these
Reveals
Verticals
Jambs

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The function of king post in a king post roof truss is

To prevent the walls from spreading outward
To support the frame work of the roof
To receive the ends of principal rafter
To prevent the tie beam from sagging at its centre

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The maximum total settlement for raft foundation on clayey soils should be limited to

65 to 100 mm
25 mm
40 to 65 mm
25 to 40 mm

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑