Building Construction In jack arch floor, the rise is kept 1/12th of the span 1/8th of the span 1/6th of the span 1/10th of the span 1/12th of the span 1/8th of the span 1/6th of the span 1/10th of the span ANSWER DOWNLOAD EXAMIANS APP
Building Construction The under surface of an arch, is called Haunch Intrados Soffit Back Haunch Intrados Soffit Back ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with the 4 to 6 mm marble chips, is known Terrazzo floor Marble floor Chip floor Reinforced marble floor Terrazzo floor Marble floor Chip floor Reinforced marble floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum width of a stair in residential buildings, is 85 cm 55 cm 100 cm 70 cm 85 cm 55 cm 100 cm 70 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Weep holes are provided in retaining and breast walls To increase compaction of the earth retained To drain off the water from the filling To add architectural beauty To ventilate the stone masonry To increase compaction of the earth retained To drain off the water from the filling To add architectural beauty To ventilate the stone masonry ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 1 day 14 days 7 days 4 days 1 day 14 days 7 days 4 days ANSWER DOWNLOAD EXAMIANS APP