Building Construction Gravels Never swell when they come into contact with water All listed here Vary in size between 2 to 20 mm Are cohesionless aggregates Never swell when they come into contact with water All listed here Vary in size between 2 to 20 mm Are cohesionless aggregates ANSWER DOWNLOAD EXAMIANS APP
Building Construction Auger boring Is generally employed in cohesive and other self soils above water table Is the most primitive method for making a hole in the ground All of these Is most economical up-to a depth of 5 meters Is generally employed in cohesive and other self soils above water table Is the most primitive method for making a hole in the ground All of these Is most economical up-to a depth of 5 meters ANSWER DOWNLOAD EXAMIANS APP
Building Construction Sum of tread and rise must lie between 500 to 550 mm 300 to 350 mm 600 to 650 mm 400 to 450 mm 500 to 550 mm 300 to 350 mm 600 to 650 mm 400 to 450 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A base course is prepared as in cement concrete flooring A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling Glass strips are driven into the layer according to the pattern required After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A base course is prepared as in cement concrete flooring A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling ANSWER DOWNLOAD EXAMIANS APP
Building Construction Bearing capacity of soils cannot be improved by Watering surface of soil Driving sand piles Draining sub-soil water Ramming crushed stone in soil Watering surface of soil Driving sand piles Draining sub-soil water Ramming crushed stone in soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 15 to 20 cm 5 to 10 cm 25 to 30 cm 30 to 45 cm 15 to 20 cm 5 to 10 cm 25 to 30 cm 30 to 45 cm ANSWER DOWNLOAD EXAMIANS APP