Building Construction The entrained concrete is used in lining walls and roofs for making Neither (A) nor (B) Both (A) and (B) Heat insulated Sound insulated Neither (A) nor (B) Both (A) and (B) Heat insulated Sound insulated ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple close roof is suitable for maximum span of 3.5 m 4.5 m 5.5 m 2.5 m 3.5 m 4.5 m 5.5 m 2.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction In clay soil Swelling and shrinkage characteristics prevail All listed here Consolidation continues even after several years of construction Differential settlement is generally prevalent Swelling and shrinkage characteristics prevail All listed here Consolidation continues even after several years of construction Differential settlement is generally prevalent ANSWER DOWNLOAD EXAMIANS APP
Building Construction Bearing capacity of soils cannot be improved by Draining sub-soil water Driving sand piles Ramming crushed stone in soil Watering surface of soil Draining sub-soil water Driving sand piles Ramming crushed stone in soil Watering surface of soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to 25 % 20 % 15 % 10 % 25 % 20 % 15 % 10 % ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 2, 1, 3, 5, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 3, 2, 5, 1, 4 2, 1, 3, 5, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 3, 2, 5, 1, 4 ANSWER DOWNLOAD EXAMIANS APP