Sum of tread and rise must lie between

400 to 450 mm
500 to 550 mm
300 to 350 mm
600 to 650 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
For the construction of flyovers in sandy soils, the type of foundation provided, is

Strap footing
Raft footing
Combined footing
Pier footing

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Which of the following metal sheets is most effective in preventing dampness?

Lead sheets
All listed here
Copper sheets
Aluminium sheets

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The inner section of a cavity wall, is generally known as

Leaf wall
Pillar
Pilaster
Buttress

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The maximum total settlement for raft foundation on clayey soils should be limited to

65 to 100 mm
40 to 65 mm
25 mm
25 to 40 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Arches in the form of masonry arcs struck from more than four centres, are called

Gothic arches
Two curved arches
Drop gothic arches
Ogee arches

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑