Building Construction
Auger boring

All of these
Is generally employed in cohesive and other self soils above water table
Is most economical up-to a depth of 5 meters
Is the most primitive method for making a hole in the ground

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In the method of tube boring of soil investigation, the following is essential:

A flap valve at the bottom of tube is provided to extract the soil sample
The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand
A tube of about 2 meters length and 20 cm diameter with a cutting edge
All listed here

ANSWER DOWNLOAD EXAMIANS APP