Building Construction Auger boring Is most economical up-to a depth of 5 meters Is the most primitive method for making a hole in the ground All of these Is generally employed in cohesive and other self soils above water table Is most economical up-to a depth of 5 meters Is the most primitive method for making a hole in the ground All of these Is generally employed in cohesive and other self soils above water table ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 to 40 mm 65 to 100 mm 25 mm 40 to 65 mm 25 to 40 mm 65 to 100 mm 25 mm 40 to 65 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 12 18 24 25 12 18 24 25 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pile foundations are suitable for Compact soils Soft rocks Water logged soils Multi-storeyed buildings Compact soils Soft rocks Water logged soils Multi-storeyed buildings ANSWER DOWNLOAD EXAMIANS APP
Building Construction In high mountainous region, the type of roof generally recommended for buildings, is Mansard type Gable type Shed type Gambrel type Mansard type Gable type Shed type Gambrel type ANSWER DOWNLOAD EXAMIANS APP
Building Construction The range of spread from the wall base to outer edge of a brick work foundation does not exceed 1 horizontal to 1 vertical 2/3 horizontal to 1 vertical 2 horizontals to 1 vertical 1/2 horizontal to 1 vertical 1 horizontal to 1 vertical 2/3 horizontal to 1 vertical 2 horizontals to 1 vertical 1/2 horizontal to 1 vertical ANSWER DOWNLOAD EXAMIANS APP