Building Construction The minimum depth of foundation in clayey soils is 0.9 m 0.7 m 1.2 m 0.5 m 0.9 m 0.7 m 1.2 m 0.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction Single Flemish bond consists of English bond facing and double Flemish bond backing in each course Double Flemish bond facing and English bond backing in each course Stretcher bond facing and double Flemish bond backing in each course Double Flemish bond facing and header bond backing in each course English bond facing and double Flemish bond backing in each course Double Flemish bond facing and English bond backing in each course Stretcher bond facing and double Flemish bond backing in each course Double Flemish bond facing and header bond backing in each course ANSWER DOWNLOAD EXAMIANS APP
Building Construction The brick laid with its length parallel to the face of a wall, is a known as Closer None of these Header Stretcher Closer None of these Header Stretcher ANSWER DOWNLOAD EXAMIANS APP
Building Construction The columns of multi-storeyed buildings are designed to withstand the forces due to Dead loads Live loads Wind loads All of these Dead loads Live loads Wind loads All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 4 days 7 days 1 day 14 days 4 days 7 days 1 day 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction For a rectangular foundation of width b, eccentricity of load should not exceed b/3 b/2 b/6 b/4 b/3 b/2 b/6 b/4 ANSWER DOWNLOAD EXAMIANS APP