The minimum depth of foundation in clayey soils is

0.7 m
0.5 m
1.2 m
0.9 m

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The process of keeping concrete moist for a certain period after its finishing, is known as

Finishing of concrete
Curing of concrete
Placing of concrete
Compaction of concrete

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Couple roof is used for spans

3.5 m but less than 5 m
6.5 m but less than 8 m
3.5 m or less
5 m but less than 6.5 m

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The alignment of a cross joint along the plumb line is

Perpend
Bed block
Vertical line
Lintel

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
For a wall carrying heavy load on low bearing capacity soil,

Both (A) and (C) of the above
Reinforced concrete bed is provided
Lean concrete bed is provided
Thick concrete bed is provided

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In grillage foundations a minimum 15 cm cover is provided on

None to these
Lower beam of lower tier
Upper flange of top tier
Ends of external beams

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑