Building Construction Couple close roof is suitable for maximum span of 2.5 m 5.5 m 3.5 m 4.5 m 2.5 m 5.5 m 3.5 m 4.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of excavation of foundations, is generally measured with a Ranging rod Boning rod Steel tape Levelling staff Ranging rod Boning rod Steel tape Levelling staff ANSWER DOWNLOAD EXAMIANS APP
Building Construction Queen closer may be placed In stretcher course next to first brick In header course next to first brick In stretcher course In header course In stretcher course next to first brick In header course next to first brick In stretcher course In header course ANSWER DOWNLOAD EXAMIANS APP
Building Construction The black cotton soil Undergoes volumetric changes Swells excessively when wet All of these Shrinks excessively when dry Undergoes volumetric changes Swells excessively when wet All of these Shrinks excessively when dry ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to 40 mm 10 mm 20 mm 30 mm 40 mm 10 mm 20 mm 30 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Expansion joints in masonry walls are provided if length exceeds 40 m 10 m 20 m 30 m 40 m 10 m 20 m 30 m ANSWER DOWNLOAD EXAMIANS APP