Building Construction The arrangement of supporting an existing structure by providing supports underneath, is known as Piling Underpinning Shoring Jacking Piling Underpinning Shoring Jacking ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of stone masonry in which stones of same height are laid in layers, is called Uncoursed rubble masonry Ashlar masonry Random rubble masonry Course rubble masonry Uncoursed rubble masonry Ashlar masonry Random rubble masonry Course rubble masonry ANSWER DOWNLOAD EXAMIANS APP
Building Construction A covering of concrete placed on the exposed top of an external wall, is known as Cornice Coping Frieze Lintel Cornice Coping Frieze Lintel ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 21 days 3 days 14 days 7 days 21 days 3 days 14 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction For each storey (or, story) of a building, the depth of exploration should be 3 meters 1 meter 4 meters 2 meters 3 meters 1 meter 4 meters 2 meters ANSWER DOWNLOAD EXAMIANS APP
Building Construction Depth of lean concrete bed placed at the bottom of a wall footing, is kept 15 cm 10 cm Equal to its projection beyond wall base Less than its projection beyond wall base 15 cm 10 cm Equal to its projection beyond wall base Less than its projection beyond wall base ANSWER DOWNLOAD EXAMIANS APP