Building Construction The taper of precast concrete pile should not be more than 4 cm per metre length 5 cm per metre length 2 cm per metre length 1 cm per metre length 4 cm per metre length 5 cm per metre length 2 cm per metre length 1 cm per metre length ANSWER DOWNLOAD EXAMIANS APP
Building Construction The position of a brick when laid on its side 9 cm × 9 cm with its frog in the vertical plane, is called Brick on end Brick on bed Brick on edge Brick held vertically Brick on end Brick on bed Brick on edge Brick held vertically ANSWER DOWNLOAD EXAMIANS APP
Building Construction The inner section of a cavity wall, is generally known as Pilaster Buttress Pillar Leaf wall Pilaster Buttress Pillar Leaf wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction While investigating the site, a thick layer of fairly firm clay over a deep layer of soft clay is encountered. In such a situation, the following type of foundation is useful: Grillage foundation None of these Raft foundation Pile formation Grillage foundation None of these Raft foundation Pile formation ANSWER DOWNLOAD EXAMIANS APP
Building Construction The black cotton soil All of these Undergoes volumetric changes Swells excessively when wet Shrinks excessively when dry All of these Undergoes volumetric changes Swells excessively when wet Shrinks excessively when dry ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling Hinders the ground water observations and permeability test Is not economical for holes of less than 10 cm All listed here Is not suitable for deposits containing very coarse gravel Hinders the ground water observations and permeability test Is not economical for holes of less than 10 cm All listed here Is not suitable for deposits containing very coarse gravel ANSWER DOWNLOAD EXAMIANS APP