Building Construction For each storey (or, story) of a building, the depth of exploration should be 3 meters 1 meter 2 meters 4 meters 3 meters 1 meter 2 meters 4 meters ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here A flap valve at the bottom of tube is provided to extract the soil sample The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge All listed here A flap valve at the bottom of tube is provided to extract the soil sample ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stone masonry of finely dressed stones laid in cement or lime, is Ashlar masonry Dry rubble masonry Random rubble masonry Coursed rubble masonry Ashlar masonry Dry rubble masonry Random rubble masonry Coursed rubble masonry ANSWER DOWNLOAD EXAMIANS APP
Building Construction In flat roof of reinforced cement concrete, the recommended angle of slope, is Zero 200° 10° A few degrees Zero 200° 10° A few degrees ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple roof is used for spans 6.5 m but less than 8 m 3.5 m or less 5 m but less than 6.5 m 3.5 m but less than 5 m 6.5 m but less than 8 m 3.5 m or less 5 m but less than 6.5 m 3.5 m but less than 5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The triangular portion between any two adjacent arches and the tangent to their crowns, is Soffit Rise Haunch Spandril Soffit Rise Haunch Spandril ANSWER DOWNLOAD EXAMIANS APP