Building Construction The triangular space formed between the extrados and the horizontal line drawn through the crown of an arch is known as Haunch Spandril Voussoirs Skewbacks Haunch Spandril Voussoirs Skewbacks ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Upto roof above ground level Between ceiling and floor level Between ceiling and ground level Upto ceiling from the ground level Upto roof above ground level Between ceiling and floor level Between ceiling and ground level Upto ceiling from the ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The inner section of a cavity wall, is generally known as Leaf wall Pilaster Buttress Pillar Leaf wall Pilaster Buttress Pillar ANSWER DOWNLOAD EXAMIANS APP
Building Construction The rock formed from the solidification of molten matter (magma) is called: Sedimentary rock Metamorphic rock None of these Igneous rock Sedimentary rock Metamorphic rock None of these Igneous rock ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for isolated foundations on clayey soils should be limited to 25 mm 40 mm 65 mm 100 mm 25 mm 40 mm 65 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical posts placed at the top and bottom ends of a flight supporting the hand rail are known as Balustrades Railings Balusters Newel posts Balustrades Railings Balusters Newel posts ANSWER DOWNLOAD EXAMIANS APP