Building Construction Depth or height of the arch is the Perpendicular distance between springing line and extrados Perpendicular distance between intrados and extrados Vertical distance between springing line and intrados None of these Perpendicular distance between springing line and extrados Perpendicular distance between intrados and extrados Vertical distance between springing line and intrados None of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction A cut in frame of a door to receive the shutter, is called Horn Louver Stop Rebate Horn Louver Stop Rebate ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 14 days 7 days 3 days 21 days 14 days 7 days 3 days 21 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than h/4 1/2h h 2 h h/4 1/2h h 2 h ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for foundations, is 50 to 100 mm 25 to 50 mm 75 to 125 mm 30 to 125 mm 50 to 100 mm 25 to 50 mm 75 to 125 mm 30 to 125 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction A roof which slopes in four directions, is called Shed roof Hipped roof Gambrel roof Gable end roof Shed roof Hipped roof Gambrel roof Gable end roof ANSWER DOWNLOAD EXAMIANS APP