Building Construction
Depth or height of the arch is the

Vertical distance between springing line and intrados
None of these
Perpendicular distance between springing line and extrados
Perpendicular distance between intrados and extrados

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Auger boring

Is most economical up-to a depth of 5 meters
Is the most primitive method for making a hole in the ground
All of these
Is generally employed in cohesive and other self soils above water table

ANSWER DOWNLOAD EXAMIANS APP