Building Construction The method of moving each brick through a small horizontal distance before it is finally laid in any brick wall and pressing it by means of brick hammer, is known as Grouting Placing Laying Troweling Grouting Placing Laying Troweling ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 3, 2, 5, 1, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 2, 1, 3, 5, 4 3, 2, 5, 1, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 2, 1, 3, 5, 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction For effective drainage, the finished surface of flat roof should have a minimum slope of 1 in 5 1 to 50 1 in 10 1 in 20 1 in 5 1 to 50 1 in 10 1 in 20 ANSWER DOWNLOAD EXAMIANS APP
Building Construction Expansion joints in masonry walls are provided if length exceeds 10 m 40 m 30 m 20 m 10 m 40 m 30 m 20 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction In grillage foundations, distance between flanges of grillage beams, is kept Twice the flange width 40 cm Equal to flange width Maximum of (A), (B) and (C) Twice the flange width 40 cm Equal to flange width Maximum of (A), (B) and (C) ANSWER DOWNLOAD EXAMIANS APP
Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Simplex pile Franki pile Vibro pile Pressure pile Simplex pile Franki pile Vibro pile Pressure pile ANSWER DOWNLOAD EXAMIANS APP