Building Construction Weep holes are provided in retaining and breast walls To drain off the water from the filling To ventilate the stone masonry To add architectural beauty To increase compaction of the earth retained To drain off the water from the filling To ventilate the stone masonry To add architectural beauty To increase compaction of the earth retained ANSWER DOWNLOAD EXAMIANS APP
Building Construction Minimum width of landing should be Equal to width of stairs Twice the width of stairs Half the width of stairs One fourth the width of stairs Equal to width of stairs Twice the width of stairs Half the width of stairs One fourth the width of stairs ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible deflection of a timber beam supporting a roof, is L/360 L/100 L/260 L/150 L/360 L/100 L/260 L/150 ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 25 24 12 18 25 24 12 18 ANSWER DOWNLOAD EXAMIANS APP
Building Construction As compared to stretcher course, the thickness of joints in header course should be More Equal Equal or more Less More Equal Equal or more Less ANSWER DOWNLOAD EXAMIANS APP
Building Construction While designing a stair, the product of rise and going is approximately kept equal to 350 450 500 420 350 450 500 420 ANSWER DOWNLOAD EXAMIANS APP