Building Construction Weep holes are provided in retaining and breast walls To drain off the water from the filling To increase compaction of the earth retained To ventilate the stone masonry To add architectural beauty To drain off the water from the filling To increase compaction of the earth retained To ventilate the stone masonry To add architectural beauty ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lower edge of the pitched roof, from where the rain water of the roof surface drops down, is known as Gable Ridge Hip Eaves Gable Ridge Hip Eaves ANSWER DOWNLOAD EXAMIANS APP
Building Construction Exposed portions of vertical surface at right angles to the door or window frame, are known as Lintels Reveals Jambs Soffits Lintels Reveals Jambs Soffits ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 25 24 12 18 25 24 12 18 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The sound which continues even after its source is cut off, is called Interference Reverberation Intensity of sound Echo Interference Reverberation Intensity of sound Echo ANSWER DOWNLOAD EXAMIANS APP
Building Construction The construction joints in buildings are provided after 15 m 10 m 20 m 40 m 15 m 10 m 20 m 40 m ANSWER DOWNLOAD EXAMIANS APP