Building Construction In verandah (corridor) floors outward slope is 1 in 70 1 in 40 1 in 50 1 in 60 1 in 70 1 in 40 1 in 50 1 in 60 ANSWER DOWNLOAD EXAMIANS APP
Building Construction A stair should not have pitch more than 30° 25° 50° 40° 30° 25° 50° 40° ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of working a flat for the finishing coat, is known Floating Blistering Dubbing out Knitting Floating Blistering Dubbing out Knitting ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lower edge of the pitched roof, from where the rain water of the roof surface drops down, is known as Gable Hip Eaves Ridge Gable Hip Eaves Ridge ANSWER DOWNLOAD EXAMIANS APP
Building Construction The triangular space formed between the extrados and the horizontal line drawn through the crown of an arch is known as Spandril Voussoirs Haunch Skewbacks Spandril Voussoirs Haunch Skewbacks ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dutch bond is a modification of English bond Single Flemish bond Stretcher bond Header bond English bond Single Flemish bond Stretcher bond Header bond ANSWER DOWNLOAD EXAMIANS APP