Building Construction In verandah (corridor) floors outward slope is 1 in 60 1 in 50 1 in 70 1 in 40 1 in 60 1 in 50 1 in 70 1 in 40 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Pressure pile Vibro pile Franki pile Simplex pile Pressure pile Vibro pile Franki pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 7 days 14 days 1 day 4 days 7 days 14 days 1 day 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The Auger borings are not common None of these In soft soils In soils that require lateral support In cohesive soils None of these In soft soils In soils that require lateral support In cohesive soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided on a sloping roof of a building, is called Dormer window Rash window Louvered window Lantern window Dormer window Rash window Louvered window Lantern window ANSWER DOWNLOAD EXAMIANS APP
Building Construction In ordinary residential and public buildings, the damp proof course is generally provided at Midway ground level and water-table level Plinth level Water table level Ground level Midway ground level and water-table level Plinth level Water table level Ground level ANSWER DOWNLOAD EXAMIANS APP