Building Construction In ordinary residential and public buildings, the damp proof course is generally provided at Water table level Plinth level Ground level Midway ground level and water-table level Water table level Plinth level Ground level Midway ground level and water-table level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 65 to 100 mm 25 to 40 mm 25 mm 40 to 65 mm 65 to 100 mm 25 to 40 mm 25 mm 40 to 65 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The member which is placed horizontally to support common rafter of a sloping roof, is Strut Batten Purlin Cleat Strut Batten Purlin Cleat ANSWER DOWNLOAD EXAMIANS APP
Building Construction An ordinary concrete may be made water proof by adding Pudlo Impermo All of these Snowcem Pudlo Impermo All of these Snowcem ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple close roof is suitable for maximum span of 4.5 m 2.5 m 3.5 m 5.5 m 4.5 m 2.5 m 3.5 m 5.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of an arch is the distance between Intrados and extrados Crown and springing line Ground level and springing line Crown and ground level Intrados and extrados Crown and springing line Ground level and springing line Crown and ground level ANSWER DOWNLOAD EXAMIANS APP