Building Construction

Building Construction
The compaction of concrete in the drilled pile hole is done by compressed air in the case of

Vibro pile
Franki pile
Pressure pile
Simplex pile

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The depth of the ground water table may be ascertained by

Looking through the well in the vicinity
None of these
Measuring the depth of water in the well
Standing on the well in the vicinity

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The bearing capacity of piles is determined by

Dynamic formula
Pile load tests
Static formula
All of these

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The Auger boring method is not suitable for

All of these
Vary soft soil
Very hard soil
Cemented soil

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The vertical distance between the springing line and highest point of the inner curve of an arch is known as

Spandril
Rise
Extrados
Intrados

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form Work including the props can be removed from beams, only after

3 days
21 days
7 days
14 days

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑