Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Vibro pile Franki pile Pressure pile Simplex pile Vibro pile Franki pile Pressure pile Simplex pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of the ground water table may be ascertained by Looking through the well in the vicinity None of these Measuring the depth of water in the well Standing on the well in the vicinity Looking through the well in the vicinity None of these Measuring the depth of water in the well Standing on the well in the vicinity ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of piles is determined by Dynamic formula Pile load tests Static formula All of these Dynamic formula Pile load tests Static formula All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The Auger boring method is not suitable for All of these Vary soft soil Very hard soil Cemented soil All of these Vary soft soil Very hard soil Cemented soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Spandril Rise Extrados Intrados Spandril Rise Extrados Intrados ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 3 days 21 days 7 days 14 days 3 days 21 days 7 days 14 days ANSWER DOWNLOAD EXAMIANS APP