Building Construction Pick up the correct specification of one-room quarters generally adopted from the following: The front verandah is kept 2 m wide The size of room is either 3.5 m × 3 m or 4.2 m × 2.5 m Six quarters in a row All listed here The front verandah is kept 2 m wide The size of room is either 3.5 m × 3 m or 4.2 m × 2.5 m Six quarters in a row All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lintels are preferred to arches because All of these Arches are difficult in construction Arches require strong abutments to withstand arch thrust Arches require more headroom to span the openings like doors, windows etc. All of these Arches are difficult in construction Arches require strong abutments to withstand arch thrust Arches require more headroom to span the openings like doors, windows etc. ANSWER DOWNLOAD EXAMIANS APP
Building Construction Cavity wall is generally provided for Prevention of dampness All of these Sound insulation Heat insulation Prevention of dampness All of these Sound insulation Heat insulation ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of working a flat for the finishing coat, is known Floating Blistering Knitting Dubbing out Floating Blistering Knitting Dubbing out ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of arch used for high class buildings where appearance is of prime importance, is known as Gauged brick arch Ashlar arch Axed brick arch Rubble arch Gauged brick arch Ashlar arch Axed brick arch Rubble arch ANSWER DOWNLOAD EXAMIANS APP
Building Construction For each storey (or, story) of a building, the depth of exploration should be 2 meters 1 meter 4 meters 3 meters 2 meters 1 meter 4 meters 3 meters ANSWER DOWNLOAD EXAMIANS APP