Building Construction Suitable spacing of timber piles, is 90 cm 100 cm 80 cm 70 cm 90 cm 100 cm 80 cm 70 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The alignment of a cross joint along the plumb line is Perpend Vertical line Lintel Bed block Perpend Vertical line Lintel Bed block ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 7 days 21 days 3 days 14 days 7 days 21 days 3 days 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which projects outside a room of a building for admitting more light and air, is known Bay window Casement window Dormer window Lantern window Bay window Casement window Dormer window Lantern window ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum depth of foundation in clayey soils is 0.7 m 0.9 m 0.5 m 1.2 m 0.7 m 0.9 m 0.5 m 1.2 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction For the construction of flyovers in sandy soils, the type of foundation provided, is Pier footing Raft footing Strap footing Combined footing Pier footing Raft footing Strap footing Combined footing ANSWER DOWNLOAD EXAMIANS APP