Irrigation Engineering The measure to remove water logging of land, is To reduce percolation from canals and water courses Both (a) and (b) To increase outflow from the ground water reservoir Neither (a) nor (b) To reduce percolation from canals and water courses Both (a) and (b) To increase outflow from the ground water reservoir Neither (a) nor (b) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If it rains between 2 P.M. and 3 P.M. and the entire basin area just starts contributing water at 3 P.M. to the outlet, then time of concentration will be 30 minutes 20 minutes 60 minutes 15 minutes 30 minutes 20 minutes 60 minutes 15 minutes ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Disposal of extra excavated earth of canals, is utilized to provide a spoil bank on Right side Left side All listed here Both sides Right side Left side All listed here Both sides ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Irrigation water having the concentration of Na++ , Ca++ and Mg++ as 20, 3 and 1 Milli equivalent per litre respectively will be classified as medium sodium water low sodium water high sodium water very high sodium water medium sodium water low sodium water high sodium water very high sodium water ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The water utilizable by plants is available in soils mainly in the form of capillary water chemical water hydroscopic water gravity water capillary water chemical water hydroscopic water gravity water ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If d1 is the depth of cutting, d2 is the height of the bank from bed level r2 : 1 and r1 : 1 are the slopes in filling and cutting respectively, the horizontal distance n between the bed and bank, is x = d2 / r2 x = r1 d1 x = d1 / r1 x = r2 d2 x = d2 / r2 x = r1 d1 x = d1 / r1 x = r2 d2 ANSWER DOWNLOAD EXAMIANS APP