Irrigation Engineering The measure to remove water logging of land, is Both (a) and (b) To reduce percolation from canals and water courses To increase outflow from the ground water reservoir Neither (a) nor (b) Both (a) and (b) To reduce percolation from canals and water courses To increase outflow from the ground water reservoir Neither (a) nor (b) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The discharge passing over an ogee spillway is given by (where, L is effective length of spillway crest and H is the total head over the spillway crest including velocity head.) CLH1/2 CHL3/2 CLH3/2 CLH5/2 CLH1/2 CHL3/2 CLH3/2 CLH5/2 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be 30 m3/sec 20 m3/sec 25 m3/sec 35 m3/sec 30 m3/sec 20 m3/sec 25 m3/sec 35 m3/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a Sarda type fall, the rectangular crest, may be used for discharge upto 6 cumecs 14 cumecs 10 cumecs 20 cumecs 6 cumecs 14 cumecs 10 cumecs 20 cumecs ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the optimum depth of kor watering for a crop is 15.12 cm, the outlet factor for the crop for four week period in hectares per cumec, is 1700 1600 1400 1500 1700 1600 1400 1500 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The kor depth for rice is 190 mm and kor period is 14 days. The outlet factor for this will be 637 hectares/m3/sec 972 hectares/m3/sec 837 hectares/m3/sec 1172 hectares/m3/sec 637 hectares/m3/sec 972 hectares/m3/sec 837 hectares/m3/sec 1172 hectares/m3/sec ANSWER DOWNLOAD EXAMIANS APP