Irrigation Engineering A river training work is generally required when the river is All of these Aggrading Degrading Meandering All of these Aggrading Degrading Meandering ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A counter berm is A vertical benching provided on the outer edge of the bank A vertical benching provided on the inner edge of the bank A horizontal benching provided on the outside slope A horizontal benching provided on the inside slope A vertical benching provided on the outer edge of the bank A vertical benching provided on the inner edge of the bank A horizontal benching provided on the outside slope A horizontal benching provided on the inside slope ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If D is the depth of scour below original bed, then the width of launching apron is generally taken as 2.0 D 2.5 D 1.5 D 1.2 D 2.0 D 2.5 D 1.5 D 1.2 D ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For the upstream face of an earthen dam, the most adverse condition for stability of slope is sudden drawdown sloughing of slope during construction steady seepage sudden drawdown sloughing of slope during construction steady seepage ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The level of the floor of a syphon aqueduct can be obtained By subtracting the depth of the culvert from the canal bed level By subtracting the thickness of culvert plus the depth of the culvert from the canal bed level Both (a) and (b) None of these By subtracting the depth of the culvert from the canal bed level By subtracting the thickness of culvert plus the depth of the culvert from the canal bed level Both (a) and (b) None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For standing crops in undulating sandy fields, the best method of irrigation, is Check method Sprinkler irrigation Free flooding Furrow method Check method Sprinkler irrigation Free flooding Furrow method ANSWER DOWNLOAD EXAMIANS APP