Irrigation Engineering Which of the following canal structures is used to remove surplus water from an irrigation channel into a natural drain ? canal regulator canal fall canal outlet canal escape canal regulator canal fall canal outlet canal escape ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the intensity of rainfall is more than the infiltration capacity of soil, then the infiltration rate will be more than infiltration capacity equal to infiltration capacity more than rate of rainfall equal to rate of rainfall more than infiltration capacity equal to infiltration capacity more than rate of rainfall equal to rate of rainfall ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The normal annual precipitation at stations X, A, B and C are 700 mm, 1000 mm, 900 mm and 800 mm respectively. If the storm precipitation at three station A, B and C were 100 mm, 90 mm and 80 mm respectively, then the storm precipitation for station X will be 105 mm 90 mm 70mm 80mm 105 mm 90 mm 70mm 80mm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A runoff river plant is None of these a low head scheme a medium head scheme a high head scheme None of these a low head scheme a medium head scheme a high head scheme ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The depth of the crest of a scouring sluice below the crest of a head regulator, is generally kept 3.20 m 2.20 m 1.20 m 0.20 m 3.20 m 2.20 m 1.20 m 0.20 m ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A counter berm is A vertical benching provided on the inner edge of the bank A horizontal benching provided on the outside slope A vertical benching provided on the outer edge of the bank A horizontal benching provided on the inside slope A vertical benching provided on the inner edge of the bank A horizontal benching provided on the outside slope A vertical benching provided on the outer edge of the bank A horizontal benching provided on the inside slope ANSWER DOWNLOAD EXAMIANS APP