Irrigation Engineering Lane's weighted creep theory assumes Equal weightage to horizontal and vertical creeps Triple weightage to horizontal creep and one weightage to vertical creep Triple weightage to vertical creep and one weightage to horizontal creep Double weightage to horizontal creep and one weightage to vertical creep Equal weightage to horizontal and vertical creeps Triple weightage to horizontal creep and one weightage to vertical creep Triple weightage to vertical creep and one weightage to horizontal creep Double weightage to horizontal creep and one weightage to vertical creep ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the irrigation efficiency is 80%, conveyance losses are 20% and the actual depth of watering is 16 cm, the depth of water required at the canal outlet, is 10 cm 15 cm 25 cm 20 cm 10 cm 15 cm 25 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The measure to remove water logging of land, is Both (a) and (b) Neither (a) nor (b) To increase outflow from the ground water reservoir To reduce percolation from canals and water courses Both (a) and (b) Neither (a) nor (b) To increase outflow from the ground water reservoir To reduce percolation from canals and water courses ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The main function of a divide wall is to prevent river floods from entering the canal provide smooth flow at sufficiently low velocity separate the undersluices from weir proper control the silt entry in the canal prevent river floods from entering the canal provide smooth flow at sufficiently low velocity separate the undersluices from weir proper control the silt entry in the canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct statement from the following and answer In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing a regulator is provided across the drainage at its down-stream All of these In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing a regulator is provided across the drainage at its down-stream All of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The top of the capillary zone None of these Lies above the water table at every point Coincides the water table at every point Lies below the water table at every point None of these Lies above the water table at every point Coincides the water table at every point Lies below the water table at every point ANSWER DOWNLOAD EXAMIANS APP