Surveying The flying height of the camera is 1,000 m above mean ground level, the distance of the top of a building from a nadir point is 10 cm and the relief displacement of building is 7.2 mm. The height of the building, is 62 m 72 m 82 m 52 m 62 m 72 m 82 m 52 m ANSWER DOWNLOAD EXAMIANS APP
Surveying The angle between the plane of the equator and the plane of the ecliptic, is known as obliquity of the ecliptic and its value is 24° 0' 22° 30' 23° 27' 23° 30' 24° 0' 22° 30' 23° 27' 23° 30' ANSWER DOWNLOAD EXAMIANS APP
Surveying After fixing the plane table to the tripod, the main operations which are needed at each plane table station are (i) Levelling (ii) Orientation (iii) CenteringThe correct sequence of these operations is (ii), (iii), (i) (iii), (i), (ii) (i), (ii), (iii) (i), (iii), (ii) (ii), (iii), (i) (iii), (i), (ii) (i), (ii), (iii) (i), (iii), (ii) ANSWER DOWNLOAD EXAMIANS APP
Surveying The position of the sun when its north declination is maximum is known as Autumnal equinox Summer solstice Winter solstice Vernal equinox Autumnal equinox Summer solstice Winter solstice Vernal equinox ANSWER DOWNLOAD EXAMIANS APP
Surveying In direct method of contouring, the process of locating or identifying points lying on a contour is called horizontal control centring vertical control ranging horizontal control centring vertical control ranging ANSWER DOWNLOAD EXAMIANS APP
Surveying The correction applied to the measured base of length ‘L’ is Tension = (P - Ps)L/AE Slope = (h²/2L) + (h⁴/8L³) where h is height difference of end supports All of these Sag = L³w²/24P² where w is the weight of tape/m Tension = (P - Ps)L/AE Slope = (h²/2L) + (h⁴/8L³) where h is height difference of end supports All of these Sag = L³w²/24P² where w is the weight of tape/m ANSWER DOWNLOAD EXAMIANS APP