Power Systems Out of the following plant categories which is not the base load power plant? Pump storage. Diesel. Nuclear. Run of river. Pump storage. Diesel. Nuclear. Run of river. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is best suited for capacitor bank switching? Vacuum CB. Oil CB. SF6 CB. Air blast CB. Vacuum CB. Oil CB. SF6 CB. Air blast CB. ANSWER DOWNLOAD EXAMIANS APP
Power Systems To prevent maloperation of deferentially connected relay while energizing a transformer, the relay restraining coil is biased with 2nd harmonic current. 7th harmonic current. 5th harmonic current. 3rd harmonic current. 2nd harmonic current. 7th harmonic current. 5th harmonic current. 3rd harmonic current. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The insulation of modern EHV is designed based on lightning voltage. RI. corona. switching voltage. lightning voltage. RI. corona. switching voltage. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For 132 kV system, the reactance and capacitance up to the location of the CB is 3 Ω and 0.015 μF respectively. The maximum value of RRRV is 12.2 kV / μs. 2.0 kV / μs. 9.01 kV / μs. 10.01 kV / μs. 12.2 kV / μs. 2.0 kV / μs. 9.01 kV / μs. 10.01 kV / μs. ANSWER DOWNLOAD EXAMIANS APP