Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is best suited for capacitor bank switching? Oil CB. Air blast CB. SF6 CB. Vacuum CB. Oil CB. Air blast CB. SF6 CB. Vacuum CB. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Gauss Seidel load flow method has following disadvantages. Which of the following statement is wrong? Unreliable convergence A good initial guess for voltages is essential for convergence Slow convergence Choice of slack bus affects the convergence Unreliable convergence A good initial guess for voltages is essential for convergence Slow convergence Choice of slack bus affects the convergence ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station plant load factor is defined as the ratio of minimum load to average load the energy generated to that of maximum energy that could have been generated average load to the peak load minimum load to peak load minimum load to average load the energy generated to that of maximum energy that could have been generated average load to the peak load minimum load to peak load ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 100 Km long transmission line is loaded at 110 kV. If the loss of line is 5 MW and the load is 150 VA the resistance of the line is 4.65 Ω / phase. 8.06 Ω / phase. 2.26 Ω / phase. 6.06 Ω / phase. 4.65 Ω / phase. 8.06 Ω / phase. 2.26 Ω / phase. 6.06 Ω / phase. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following plants has the maximum eapital cost Steam plants. Diesel plants. Nuclear plants. Hydro-plants. Steam plants. Diesel plants. Nuclear plants. Hydro-plants. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading (SIL) is represented by Vl²*√(C/L) Vl²/Zs both 1 and 2 Vph²/Zs Vl²*√(C/L) Vl²/Zs both 1 and 2 Vph²/Zs ANSWER DOWNLOAD EXAMIANS APP