Power Systems For 132 kV system, the reactance and capacitance up to the location of the CB is 3 Ω and 0.015 μF respectively. The maximum value of RRRV is 2.0 kV / μs. 9.01 kV / μs. 12.2 kV / μs. 10.01 kV / μs. 2.0 kV / μs. 9.01 kV / μs. 12.2 kV / μs. 10.01 kV / μs. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is a reaction turbines Francis turbine and Kaplan turbine. Pelton turbine and Francis turbine. Kaplan and Pelton turbine. None of these. Francis turbine and Kaplan turbine. Pelton turbine and Francis turbine. Kaplan and Pelton turbine. None of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Out of the following plant categories which is not the base load power plant? Run of river. Pump storage. Nuclear. Diesel. Run of river. Pump storage. Nuclear. Diesel. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Asynchronous tie line is a either 1 or 2 DC transmission line None of these AC transmission line either 1 or 2 DC transmission line None of these AC transmission line ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the percentage reactance of an element is 20 % and the full load current is 50 Amp, the short circuit current will be 350 Amp. 250 Amp. 200 Amp. 300 Amp. 350 Amp. 250 Amp. 200 Amp. 300 Amp. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Installation of capacitors at suitable locations and of optimum size in a distribution system results in reduction in distribution power loss reduction of KVA rating of distribution transformers All of these improved voltage regulation reduction in distribution power loss reduction of KVA rating of distribution transformers All of these improved voltage regulation ANSWER DOWNLOAD EXAMIANS APP