Power Systems
Which of the following is a reaction turbines

  None of these.
  Francis turbine and Kaplan turbine.
  Kaplan and Pelton turbine.
  Pelton turbine and Francis turbine.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In hydroelectric power plants

 both operating and initial cost are low.
  operating cost is low and initial cost is high.
 operating cost is high and initial cost is low.
 both operating and initial cost are high.

ANSWER DOWNLOAD EXAMIANS APP