Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠°90 Ω, C = 0.5*10^-6∠90° â„§. Find Charging current under no load? 0.144∠90° A/phase 0.344∠90° A/phase 1.144∠90° A/phase 0.512∠90° A/phase 0.144∠90° A/phase 0.344∠90° A/phase 1.144∠90° A/phase 0.512∠90° A/phase ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants both operating and initial cost are high. both operating and initial cost are low. operating cost is low and initial cost is high. operating cost is high and initial cost is low. both operating and initial cost are high. both operating and initial cost are low. operating cost is low and initial cost is high. operating cost is high and initial cost is low. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydroelectric power station is commonly found in hilly areas. grasslands. desert areas. swamps. hilly areas. grasslands. desert areas. swamps. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Peak load power plants is/are both 1 and 2 nuclear plants pumped storage plant diesel plant both 1 and 2 nuclear plants pumped storage plant diesel plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems In kaplan runner, the number of blades is generally of the order of 1 - 2. 16 - 24. 3 - 6. 12 - 16. 1 - 2. 16 - 24. 3 - 6. 12 - 16. ANSWER DOWNLOAD EXAMIANS APP
Power Systems On a power system network the load is increasing represents the value of impedance decrease. remains constant. increase. none of above. decrease. remains constant. increase. none of above. ANSWER DOWNLOAD EXAMIANS APP