Power Systems Which of the following matrix is used for load flow studies? Y bus matrix Unit matrix null matrix Z bus matrix Y bus matrix Unit matrix null matrix Z bus matrix ANSWER DOWNLOAD EXAMIANS APP
Power Systems The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called settling time. coasting time. stopping time. damping time. settling time. coasting time. stopping time. damping time. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A CT is connected in ___________________ with the line. both A and B. across. series. not connected. both A and B. across. series. not connected. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A diesel power plant is generally used as a/an Standby/emergency plant. Base load. Any of above. Peak loads. Standby/emergency plant. Base load. Any of above. Peak loads. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has (2 + j4)Ω impedance, 100 MVA and base voltage is 10 KV. Find the per unit impedance value of transmission line? (1 + j2 ) pu (4 + j8 ) pu (0.5 + j1 ) pu (2 + j4 ) pu (1 + j2 ) pu (4 + j8 ) pu (0.5 + j1 ) pu (2 + j4 ) pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems In load flow studies PV bus is treated as PQ bus when voltage at the bus become high any of the above phase angle become high reactive power goes beyond limit voltage at the bus become high any of the above phase angle become high reactive power goes beyond limit ANSWER DOWNLOAD EXAMIANS APP