Power Systems Which one of the following relays has the capability of anticipating the possible major fault in a transformer? Buchholz relay Over current relay Differential relay Over fluxing relay Buchholz relay Over current relay Differential relay Over fluxing relay ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a power system with negligible resistance, the fault current at a point is 8.00 pu. The series reactance is to be included at the fault point to limit the short circuit. current to 5.00 pu is 3.000 pu. 0.200 pu. 0.075 pu. 0.125 pu. 3.000 pu. 0.200 pu. 0.075 pu. 0.125 pu. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In nuclear chain fission reaction each neutron causing fission produces at least one new neutron. one new neutron. no new neutron. less than one new neutron. at least one new neutron. one new neutron. no new neutron. less than one new neutron. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The area under a flow duration curve represents total of units of energy available. maximum rate of run-off during the period. total quantity of run-off during that period. total power available. total of units of energy available. maximum rate of run-off during the period. total quantity of run-off during that period. total power available. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The specific speed of water turbine is the speed at which the turbine develops unit horse power at all heads. unit horse power at unit head. a minimum horse power. maximum horse power. unit horse power at all heads. unit horse power at unit head. a minimum horse power. maximum horse power. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The essential requirement(s) for power plants to be operated as peak load plants are Quick response to load variation. All of these Low capital cost. Capability of quick starts. Quick response to load variation. All of these Low capital cost. Capability of quick starts. ANSWER DOWNLOAD EXAMIANS APP