Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 740 MW. 720 MW. 730 MW. 710 MW. 740 MW. 720 MW. 730 MW. 710 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 5. 3. 20. 7. 5. 3. 20. 7. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a thermal power plant, which of its following components needs maximum maintenance attention Steam turbine. Super heater. Boiler. Condenser. Steam turbine. Super heater. Boiler. Condenser. ANSWER DOWNLOAD EXAMIANS APP
Power Systems One atomic mass unit is equivalent to 180.5 MeV. 120.4 MeV. 251.2 MeV. 931.4 MeV. 180.5 MeV. 120.4 MeV. 251.2 MeV. 931.4 MeV. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Capacitance voltage transformer ( CVT ) is used to none of these. reduce losses in a transmission line. connect instruments on the LT side. improve the power factor of the transmission. none of these. reduce losses in a transmission line. connect instruments on the LT side. improve the power factor of the transmission. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Sparse matrix is matrix which contain less number of memory elements more number of non zeros more number of memory elements more number of zeros less number of memory elements more number of non zeros more number of memory elements more number of zeros ANSWER DOWNLOAD EXAMIANS APP