Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 720 MW. 710 MW. 730 MW. 740 MW. 720 MW. 710 MW. 730 MW. 740 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Capacitance voltage transformer ( CVT ) is used to reduce losses in a transmission line. improve the power factor of the transmission. none of these. connect instruments on the LT side. reduce losses in a transmission line. improve the power factor of the transmission. none of these. connect instruments on the LT side. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a regenerative cycle, feed water is heated by exhaust gas. all of above. heaters. drained steam from turbine. exhaust gas. all of above. heaters. drained steam from turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power capacity of a transmission line can be increased by either 1 or 2 decreasing reactance value nether 1 nor 2 increasing voltage level either 1 or 2 decreasing reactance value nether 1 nor 2 increasing voltage level ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 1- phase transmission line operating at 30 kV has radius of 1 cm and distance between conductors is 0.5 m. Assume m = δ =1, g = 21 kV/cm and frequency f = 50 Hz. Find the critical disruptive voltage? 82.15 kV/phase 34.64 kV/phase 17.32 kV/phase 41.075 kV/phase 82.15 kV/phase 34.64 kV/phase 17.32 kV/phase 41.075 kV/phase ANSWER DOWNLOAD EXAMIANS APP
Power Systems a 50 Hz, 3-phase synchronous generator has inductance per phase of 15 mH. The capacitance of the generator and circuit breaker is 0.002 µF. What is its natural frequency? 29 kHz 2.9 kHz 29 MHz 290 kHz 29 kHz 2.9 kHz 29 MHz 290 kHz ANSWER DOWNLOAD EXAMIANS APP