Power Systems Which of the following plants is/are base load plants both 1 and 2 pump storage nuclear run off river both 1 and 2 pump storage nuclear run off river ANSWER DOWNLOAD EXAMIANS APP
Power Systems What should be the minimum depth (in metre)of cable trench to dug for laying of 1.1 kV? 0.75. 0.90. 1.05. 1.20. 0.75. 0.90. 1.05. 1.20. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Demand factor of a plant is 0 less than 1 1 greater than 1 0 less than 1 1 greater than 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has surge impedance of 400 Ω, operating at Vs = Vr = 400 kV line is compensated with a shunt capacitance of 30%. Find the surge impedance loading with compensation? 478 MW 456 MW 400 MW 386 MW 478 MW 456 MW 400 MW 386 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a reactance of 1 Pu is operating at Vs = Vr = 1 Pu. The generator is connected at source end which is delivering 0.5 Pu of active power. Find the load angle? 30° 45° 35° 60° 30° 45° 35° 60° ANSWER DOWNLOAD EXAMIANS APP
Power Systems Operating time of pumped storage plant is high very high can't say low high very high can't say low ANSWER DOWNLOAD EXAMIANS APP