Power Systems In hydroelectric power plants operating cost is high and initial cost is low. both operating and initial cost are high. operating cost is low and initial cost is high. both operating and initial cost are low. operating cost is high and initial cost is low. both operating and initial cost are high. operating cost is low and initial cost is high. both operating and initial cost are low. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Aluminium is now most commonly employed conductor material in transmission lines than copper because costlier its tensile strength is more it is cheaper and lighter it is more conductive costlier its tensile strength is more it is cheaper and lighter it is more conductive ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 10 MW 12 MW 6 MW 5 MW 10 MW 12 MW 6 MW 5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Stock bridge dampers are used in case hill areas to over come the which problem? increase string efficiency increase power factor unequal ice loading All of these increase string efficiency increase power factor unequal ice loading All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems If sag in an overhead line increase, tension in the line decrease increase None of these remains same decrease increase None of these remains same ANSWER DOWNLOAD EXAMIANS APP
Power Systems Operating time of pumped storage plant is very high low can't say high very high low can't say high ANSWER DOWNLOAD EXAMIANS APP