Power Systems In hydroelectric power plants both operating and initial cost are low. operating cost is low and initial cost is high. both operating and initial cost are high. operating cost is high and initial cost is low. both operating and initial cost are low. operating cost is low and initial cost is high. both operating and initial cost are high. operating cost is high and initial cost is low. ANSWER DOWNLOAD EXAMIANS APP
Power Systems How much KWh energy is produced by fission of 1 gm of uranium U235 24 kWh. 2400 kWh. 240 kWh. 24000 kWh. 24 kWh. 2400 kWh. 240 kWh. 24000 kWh. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What is the preferred type of circuit breaker(CB) to be installed in extra high voltage AC system? Air blast CB Sulphur hexafluoride CB Vacuum CB Bulk oil type CB Air blast CB Sulphur hexafluoride CB Vacuum CB Bulk oil type CB ANSWER DOWNLOAD EXAMIANS APP
Power Systems Operating cost of thermal power station is less than that of diesel power plant. is the same as that of nuclear power plant. less than that of hydroelectric power plant. less than that of nuclear power plant. less than that of diesel power plant. is the same as that of nuclear power plant. less than that of hydroelectric power plant. less than that of nuclear power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Corona loss is ----------------- on hilly areas than as plain areas. more remain same less None of these more remain same less None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows: IR1 = j1.5 pu, IR2 = -j0.5 pu, IR0 = -j1. The type of fault is LLG LL LLL LG LLG LL LLL LG ANSWER DOWNLOAD EXAMIANS APP