Power Systems In hydroelectric power plants both operating and initial cost are low. both operating and initial cost are high. operating cost is low and initial cost is high. operating cost is high and initial cost is low. both operating and initial cost are low. both operating and initial cost are high. operating cost is low and initial cost is high. operating cost is high and initial cost is low. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In thermal plant most of the energy is wasted in condenser turbines boiler ESP condenser turbines boiler ESP ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following material is not used as fuse element? Silver. Copper. Carbon. Aluminium. Silver. Copper. Carbon. Aluminium. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 25 MVA, 11 kV alternator is supplying full load at a point of 0.75 lagging. Determine the percentage increase in earning capacity when it is operated at improved power factor of 0.96 lagging. None of above 56 %. 28 %. 14 %. None of above 56 %. 28 %. 14 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Length of short transmission line is up to 40 km 150 km 80 km any of the above 40 km 150 km 80 km any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 20 MVA generator has inertia constant of 0.5 pu. Find new value for 50 MVA base? 0.2 pu 0.1 pu 0.4 pu 0.5 pu 0.2 pu 0.1 pu 0.4 pu 0.5 pu ANSWER DOWNLOAD EXAMIANS APP