Power Systems In hydroelectric power plants operating cost is low and initial cost is high. operating cost is high and initial cost is low. both operating and initial cost are low. both operating and initial cost are high. operating cost is low and initial cost is high. operating cost is high and initial cost is low. both operating and initial cost are low. both operating and initial cost are high. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the penalty factor of a plant is unity, its incremental transmission loss is -1 None of these 1 0 -1 None of these 1 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro power plant of run off river type should be provided with pondage so that the kinetic energy of the running water is fully utilized. firm capacity of plant is increased. operating head is controlled. pressure inside the turbine casing remains. kinetic energy of the running water is fully utilized. firm capacity of plant is increased. operating head is controlled. pressure inside the turbine casing remains. ANSWER DOWNLOAD EXAMIANS APP
Power Systems a 50 Hz, 3-phase synchronous generator has inductance per phase of 15 mH. The capacitance of the generator and circuit breaker is 0.002 µF. What is its natural frequency? 290 kHz 29 MHz 2.9 kHz 29 kHz 290 kHz 29 MHz 2.9 kHz 29 kHz ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the tests performed for oil-filled and gas-filled cables ? All of these. Thermal stability test. Load cycle tests. Impulse tests. All of these. Thermal stability test. Load cycle tests. Impulse tests. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The equation of area control error(ACE) is ACE = ΔPtie - b.Δf ACE = ΔPtie - 1/b.Δf ACE = ΔPtie +1/ b.Δf ACE = ΔPtie + b.Δf ACE = ΔPtie - b.Δf ACE = ΔPtie - 1/b.Δf ACE = ΔPtie +1/ b.Δf ACE = ΔPtie + b.Δf ANSWER DOWNLOAD EXAMIANS APP