Power Systems Operating time of pumped storage plant is very high can't say high low very high can't say high low ANSWER DOWNLOAD EXAMIANS APP
Power Systems A loss less transmission line having surge impedance loading (SIL) of 2280 MW is provided with a uniformly distributed series capacitive compensation of 30 %. Then SIL of compensated transmission line will be 2725 MW. 1835 MW. 2280 MW. 3257 MW. 2725 MW. 1835 MW. 2280 MW. 3257 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The skin effect of conductor will increase when resistivity decrease All of these diameter decrease frequency decrease resistivity decrease All of these diameter decrease frequency decrease ANSWER DOWNLOAD EXAMIANS APP
Power Systems To reduce the radio interference which line is/are transposed? None of these either 1 or 2 Both power and telecommunication lines Power line None of these either 1 or 2 Both power and telecommunication lines Power line ANSWER DOWNLOAD EXAMIANS APP
Power Systems The water from a catchment is 60*106 cu m annually and hydro station has head of 40 m. Assuming ideal generator and turbine, the power that can be theoretically generated is 500 kW 250 kW 750 kW 300 kW 500 kW 250 kW 750 kW 300 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants can generate power at unpredictable or uncontrollable time Pulverising unit. Wind turbine. Cooling tower. Condenser. Pulverising unit. Wind turbine. Cooling tower. Condenser. ANSWER DOWNLOAD EXAMIANS APP