Power Systems Operating time of pumped storage plant is high very high can't say low high very high can't say low ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the breakdown voltage of the insulator is high, the thickness of the insulator is it does not related to breakdown voltage less high None of these it does not related to breakdown voltage less high None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a nuclear reactor, chain reactor is controlled by introducing cadmium rods. brass rods. graphite rods. iron rods. cadmium rods. brass rods. graphite rods. iron rods. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Four identical alternators each are rated for 20 MVA, 11 KV having a subtransient reactance of 16% are working in parallel. The short circuit level at the busbar is 400 MVA 100 MVA 125 MVA 500 MVA 400 MVA 100 MVA 125 MVA 500 MVA ANSWER DOWNLOAD EXAMIANS APP
Power Systems With reference to hydrometer station, the graphical representation of the discharge as function of time is known as Load duration curve. Monograph. Hydro-graph. Hectograph. Load duration curve. Monograph. Hydro-graph. Hectograph. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 100 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 10 MW 80 MW 20 MW 15 MW 10 MW 80 MW 20 MW 15 MW ANSWER DOWNLOAD EXAMIANS APP