Power Systems Nuclear power plant are used as base load plants. none of above. peak load plants. intermediate load plants. base load plants. none of above. peak load plants. intermediate load plants. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The specific speed ( NS ) of turbine is given by none of these. N√( P ) / H1.25. N√( P ) / H2/3. P√( N ) / H3/2. none of these. N√( P ) / H1.25. N√( P ) / H2/3. P√( N ) / H3/2. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Attenuation occurs due to both 1 and 3 conductance resistance inductance both 1 and 3 conductance resistance inductance ANSWER DOWNLOAD EXAMIANS APP
Power Systems Under excited Synchronous phase modifier works as shunt capacitor any of the above shunt reactor series capacitor shunt capacitor any of the above shunt reactor series capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be 7.936 pu 8.936 pu 10.936 pu 9.936 pu 7.936 pu 8.936 pu 10.936 pu 9.936 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems When bundle conductor are used in place of single conductor the effective inductance and capacitance will respectively decrease and increase. decrease and remain unaffected. increase and decrease. increase and remain unaffected. decrease and increase. decrease and remain unaffected. increase and decrease. increase and remain unaffected. ANSWER DOWNLOAD EXAMIANS APP