Power Systems Storage requirement can be determined from mass Curve. hydro-graph. both B and C. flow duration curve. mass Curve. hydro-graph. both B and C. flow duration curve. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the number of strands of ACSR conductor for 4 layer transmission line? 29 37 7 1 29 37 7 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal protection switch is used to provide protection against short circuit. over voltage. temperature. overload. short circuit. over voltage. temperature. overload. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The draft tube is provided to reduce the effect of water hammer. None of these raise the water surface of the stream to create an artificial head. increase the acting head on the water wheel. reduce the effect of water hammer. None of these raise the water surface of the stream to create an artificial head. increase the acting head on the water wheel. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mho relay is used for protection of short lines. long lines. medium lines. none of these. short lines. long lines. medium lines. none of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The incremental fuel costs for two generating units G1 and G2 are given by Ic1 = 25 + 0.2 PG1 and Ic2 = 32 + 0.2 PG2, where PG1 and PG2 are real powers generated by the units. The economic allocation for a total load of 250 MW, neglecting transmission loss, is given by PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 100 MW and PG2 = 150 MW ANSWER DOWNLOAD EXAMIANS APP