Power Systems Transmission line parameters of the short transmission line are 1,0,Y,1 Z,0,Y,1 1,Z,0,1 1,Z,Y,1 1,0,Y,1 Z,0,Y,1 1,Z,0,1 1,Z,Y,1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following buses is/are not PV buses? fixed shunt capacitor buses both 1 and 2 reactive power support buses voltage control buses fixed shunt capacitor buses both 1 and 2 reactive power support buses voltage control buses ANSWER DOWNLOAD EXAMIANS APP
Power Systems The VSWR of transmission line is Proportional to load and characteristic impedance. Directly proportional to load impedance and inversely to characteristic impedance. Directly proportional to voltage minimum and inversely proportional to voltage maximum. Directly proportional to characteristic impedance and inversely to load impedance. Proportional to load and characteristic impedance. Directly proportional to load impedance and inversely to characteristic impedance. Directly proportional to voltage minimum and inversely proportional to voltage maximum. Directly proportional to characteristic impedance and inversely to load impedance. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the tests performed for oil-filled and gas-filled cables ? Impulse tests. All of these. Thermal stability test. Load cycle tests. Impulse tests. All of these. Thermal stability test. Load cycle tests. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What is the total installed power capacity (MW) in West Bengal as published by ministry of power in 2011? 15515.22. 8113.27. 10000.32. 6114.05. 15515.22. 8113.27. 10000.32. 6114.05. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Thermal power plant. Gas turbine plant. Nuclear power plant. Hydro electric power plant. Thermal power plant. Gas turbine plant. Nuclear power plant. Hydro electric power plant. ANSWER DOWNLOAD EXAMIANS APP