Power Systems

Power Systems
The conversion ratio of breeder reactor are

 less than 1.
 1.
 none of above.
  greater than 1.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Operating cost of thermal power station is

 less than that of hydroelectric power plant.
 less than that of nuclear power plant.
 is the same as that of nuclear power plant.
  less than that of diesel power plant.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A three phase, 33 kV oil circuit breaker is rated 1200 A, 2000 MVA, 3 secs. The symmetrical breaking current is

 50 kA.
  35 kA.
 45 kA.
 55 kA.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A hydroelectric power station is commonly found in

 swamps.
 desert areas.
  hilly areas.
 grasslands.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Two insulator discs of identical capacitance value C make up a string for a 22 kV, 50 Hz, single phase overhead line insulation system. If pin to earth capacitance is also C, then find the string efficiency?

 86%%
 50%
 75%
 90%

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 25 MVA, 11 kV alternator is supplying full load at a point of 0.75 lagging. Determine the percentage increase in earning capacity when it is operated at improved power factor of 0.96 lagging.

  None of above
  28 %.
  56 %.
  14 %.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑