Power Systems Ferranti effect can be compensated by which of the following shunt reactor series capacitor shunt capacitor both 1 and 2 shunt reactor series capacitor shunt capacitor both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems If we increase the spacing between the phase conductors, the value of line inductance increase remains unaffected None of these decrease increase remains unaffected None of these decrease ANSWER DOWNLOAD EXAMIANS APP
Power Systems Storage requirement can be determined from mass Curve. both B and C. hydro-graph. flow duration curve. mass Curve. both B and C. hydro-graph. flow duration curve. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station supplies the peak load of 50 MW, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55 the maximum demand on the station and average load respectively will be 51.61 MW. 52 MW. 53 MW. 57.5 MW. 51.61 MW. 52 MW. 53 MW. 57.5 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line is operating under no load has ABCD parameters B = 100∠90° has a phase shift of 0.2 rad, how much shunt reactor is required for compensation of ferranti effect? 2 H 15.9 mH 2 mH 15.9 H 2 H 15.9 mH 2 mH 15.9 H ANSWER DOWNLOAD EXAMIANS APP
Power Systems Offset mho relay is used for the protection of equipment when None of these either 1 or 2 loss of excitation of the generator failure of prime mover of the generator None of these either 1 or 2 loss of excitation of the generator failure of prime mover of the generator ANSWER DOWNLOAD EXAMIANS APP