Railway Engineering Number of keys used in CST-9 sleeper is 4 3 2 None of these 4 3 2 None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Normally maximum cant permissible in Meter Gauge is 140 mm 90 mm 75 mm 165 mm 140 mm 90 mm 75 mm 165 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Fish plate is in contact with rail at foot of rail head of rail web of rail fishing plane foot of rail head of rail web of rail fishing plane ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a scissors cross-over, the crossings provided arei) 2 obtuse angle crossingsii) 4 obtuse angle crossingsiii) 4 acute angle crossingsiv) 6 acute angle crossingsThe correct answer is (ii) and (iii) (ii) and (iv) (i) and (iii) (i)and(iv) (ii) and (iii) (ii) and (iv) (i) and (iii) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Gauge is the distance between None of these running faces of rails center to center of rails outer faces of rails None of these running faces of rails center to center of rails outer faces of rails ANSWER DOWNLOAD EXAMIANS APP