Railway Engineering Which of the following methods of designation of crossing is mostly used in India ? right angle method isosceles angle method center line method None of these right angle method isosceles angle method center line method None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the center of arm of a semaphore signal above the ground is 8.5m 7.5 m 6.5 m 5.5m 8.5m 7.5 m 6.5 m 5.5m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements 1 and 4 are correct I and 2 are correct 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct I and 2 are correct 2 and 3 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,2,4 1,3,4,2 3,1,4,2 3,1,2,4 1,3,2,4 1,3,4,2 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a shunting signal if the red band is inclined at 45° it indicates stop proceed None of these proceed cautiously stop proceed None of these proceed cautiously ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Tensile strength of steel used in rails should not be less than 850 MPa 500 MPa 450 MPa 700 MPa 850 MPa 500 MPa 450 MPa 700 MPa ANSWER DOWNLOAD EXAMIANS APP