Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements 1 and 4 are correct 2 and 3 are correct I and 2 are correct 3 and 4 are correct 1 and 4 are correct 2 and 3 are correct I and 2 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A treadle bar is used for setting marshalling yard signals track maintenance setting points and crossings interlocking points and signal setting marshalling yard signals track maintenance setting points and crossings interlocking points and signal ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The treadle bar is provided near and parallel to inner side of both the rails in the middle of the track a little in front of the toes of the tongue rail near and parallel to inner side of one of the rails at right angle to the rail near and parallel to inner side of both the rails in the middle of the track a little in front of the toes of the tongue rail near and parallel to inner side of one of the rails at right angle to the rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The compensation for curvature on gradient for Meter Gauge is given by (where R is radius of curve.) 105/R 70/R 35/R 52.5/R 105/R 70/R 35/R 52.5/R ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the center of arm of a semaphore signal above the ground is 8.5m 7.5 m 5.5m 6.5 m 8.5m 7.5 m 5.5m 6.5 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following methods of designation of crossing is mostly used in India ? None of these center line method right angle method isosceles angle method None of these center line method right angle method isosceles angle method ANSWER DOWNLOAD EXAMIANS APP