Industrial Engineering and Production Management Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it Consumes resources but no time Consumes neither time nor resources Consumes time, but no resources Is a dangling event Consumes resources but no time Consumes neither time nor resources Consumes time, but no resources Is a dangling event ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management M.T.M. is used to All of these Improve existing methods Develop effective methods in advance of the beginning of production Establish time standards All of these Improve existing methods Develop effective methods in advance of the beginning of production Establish time standards ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if Arrival and waiting times are known and can be grouped to form a waiting line model All variables and constants are known and form a linear equation The laws governing arrivals, service times, and the order in which the arriving units are taken into source are known Complete details of items in, waiting line are known Arrival and waiting times are known and can be grouped to form a waiting line model All variables and constants are known and form a linear equation The laws governing arrivals, service times, and the order in which the arriving units are taken into source are known Complete details of items in, waiting line are known ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The main objective of work measurement is to Formulate a proper incentive scheme Plan and schedule of production Estimate the selling prices and delivery dates All of these Formulate a proper incentive scheme Plan and schedule of production Estimate the selling prices and delivery dates All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following equations is not in conformity with others? Ability × motivation = performance Organization performance × motivation = profits Knowledge × skill = ability Attitude × situation = motivation Ability × motivation = performance Organization performance × motivation = profits Knowledge × skill = ability Attitude × situation = motivation ANSWER DOWNLOAD EXAMIANS APP