Industrial Engineering and Production Management The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time) (to + tp + 4tn)/6 (to + 2tp + tn)/4 (to + 4tp + tn)/5 (to + tp + tn)/3 (to + tp + 4tn)/6 (to + 2tp + tn)/4 (to + 4tp + tn)/5 (to + tp + tn)/3 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Acceptance sampling is used in Mass production All of these Batch production Job production Mass production All of these Batch production Job production ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The assumption in PERT is Cost of project will always be more than the estimated cost, if no timely corrections are taken A project can be subdivided into a set of predictable, independent activities A project will always be behind schedule, if left uncorrected Activities are fixed and can't be changed Cost of project will always be more than the estimated cost, if no timely corrections are taken A project can be subdivided into a set of predictable, independent activities A project will always be behind schedule, if left uncorrected Activities are fixed and can't be changed ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Bin card is used in Workshop Stores Foundry shop Administrative wing Workshop Stores Foundry shop Administrative wing ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The performance of a specific task in CPM is known as Activity Dummy Event Contract Activity Dummy Event Contract ANSWER DOWNLOAD EXAMIANS APP