Industrial Engineering and Production Management The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time) (to + 4tp + tn)/5 (to + tp + tn)/3 (to + 2tp + tn)/4 (to + tp + 4tn)/6 (to + 4tp + tn)/5 (to + tp + tn)/3 (to + 2tp + tn)/4 (to + tp + 4tn)/6 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Acceptance sampling is used in Job production All of these Mass production Batch production Job production All of these Mass production Batch production ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The assumption in PERT is Activities are fixed and can't be changed A project will always be behind schedule, if left uncorrected Cost of project will always be more than the estimated cost, if no timely corrections are taken A project can be subdivided into a set of predictable, independent activities Activities are fixed and can't be changed A project will always be behind schedule, if left uncorrected Cost of project will always be more than the estimated cost, if no timely corrections are taken A project can be subdivided into a set of predictable, independent activities ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Bin card is used in Administrative wing Stores Foundry shop Workshop Administrative wing Stores Foundry shop Workshop ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The performance of a specific task in CPM is known as Dummy Activity Event Contract Dummy Activity Event Contract ANSWER DOWNLOAD EXAMIANS APP