Industrial Engineering and Production Management Acceptance sampling is used in Batch production Job production Mass production All of these Batch production Job production Mass production All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A dummy activity in a net work diagram All of these Is an artificial activity Does not consume time or resources Is represented by a dotted line All of these Is an artificial activity Does not consume time or resources Is represented by a dotted line ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT requires None of the listed here Single time estimate Triple time estimate Double time estimate None of the listed here Single time estimate Triple time estimate Double time estimate ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In Lincoln plan (one type of group incentive plan), the amount of the profit which an employee receives in addition to the guaranteed basic pay/wages, is based on: A merit rating system A standard rating system A job evaluation system His individual performance A merit rating system A standard rating system A job evaluation system His individual performance ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The essential condition for the decompression of an activity is that The project time should change due to decompression An activity could be decompressed to the maximum extent of its normal time An activity could be decompressed to the maximum extent of its normal time After decompression the time of an activity invariably exceeds its normal time The project time should change due to decompression An activity could be decompressed to the maximum extent of its normal time An activity could be decompressed to the maximum extent of its normal time After decompression the time of an activity invariably exceeds its normal time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Work study is concerned with Improving present method and finding standard time Improving production capability Improving production planning and control Motivation of workers Improving present method and finding standard time Improving production capability Improving production planning and control Motivation of workers ANSWER DOWNLOAD EXAMIANS APP