Industrial Engineering and Production Management Emergency rush order can be pushed more effectively in Continuous production Automatic production Intermittent production Job production Continuous production Automatic production Intermittent production Job production ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In time study, the rating factor is applied to determine Merit rating of the worker Standard time of a job Normal time of a worker Fixation of incentive rate Merit rating of the worker Standard time of a job Normal time of a worker Fixation of incentive rate ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be TR + (S - T) × R TR TR + [(S - T)/2] × R TR + [(S - T)/S] × R TR + (S - T) × R TR TR + [(S - T)/2] × R TR + [(S - T)/S] × R ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Work study involves Only method study Only motion study Method study and work measurement Only work measurement Only method study Only motion study Method study and work measurement Only work measurement ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Actual performance of a task is called An activity A duration An event None of these An activity A duration An event None of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In order that linear programming techniques provide valid results Either (A) or (B) Relations between factors must be linear (positive) Only one factor should change at a time, others remaining constant Relations between factors must be linear (negative) Either (A) or (B) Relations between factors must be linear (positive) Only one factor should change at a time, others remaining constant Relations between factors must be linear (negative) ANSWER DOWNLOAD EXAMIANS APP