Industrial Engineering and Production Management Which of the following is independent of sales forecast? Productivity Production planning Production control Inventory control Productivity Production planning Production control Inventory control ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The main disadvantage of line organisation is All of these Top level executives have to do excessive work Communication delays occur Structure is rigid All of these Top level executives have to do excessive work Communication delays occur Structure is rigid ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to MAPI formula, the old machine should be replaced by new one when (Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum) CAM = DAM There is no such criterion CAM > DAM CAM < DAM CAM = DAM There is no such criterion CAM > DAM CAM < DAM ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A milestone chart Points outgoing ahead of schedule of jobs, if any None of the these Shows the inter dependences of various jobs Depicts the delay of jobs, if any Points outgoing ahead of schedule of jobs, if any None of the these Shows the inter dependences of various jobs Depicts the delay of jobs, if any ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The main advantage of line organisation is its Defined responsibilities at all levels Effective command and control All of these Rigid discipline in the organisation Defined responsibilities at all levels Effective command and control All of these Rigid discipline in the organisation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The assumption in PERT is A project will always be behind schedule, if left uncorrected Cost of project will always be more than the estimated cost, if no timely corrections are taken A project can be subdivided into a set of predictable, independent activities Activities are fixed and can't be changed A project will always be behind schedule, if left uncorrected Cost of project will always be more than the estimated cost, if no timely corrections are taken A project can be subdivided into a set of predictable, independent activities Activities are fixed and can't be changed ANSWER DOWNLOAD EXAMIANS APP