Highway Engineering In the penetration macadam construction, the bitumen is Sprayed after the aggregates are spread and compacted Premixed with aggregates and then spread Sprayed before the aggregates are spread and compacted None of these Sprayed after the aggregates are spread and compacted Premixed with aggregates and then spread Sprayed before the aggregates are spread and compacted None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at 2.5 mm penetration only 7.5 mm penetration only 5.0 mm penetration only both 2.5 mm and 5.0 mm penetrations 2.5 mm penetration only 7.5 mm penetration only 5.0 mm penetration only both 2.5 mm and 5.0 mm penetrations ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Centre line markings are used to designate proper lateral placement of vehicles before turning to different directions to indicate that overtaking is not permitted to designate traffic lanes in roadways meant for two way traffic to designate proper lateral placement of vehicles before turning to different directions to indicate that overtaking is not permitted to designate traffic lanes in roadways meant for two way traffic ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Maximum daily traffic capacity of bituminous pavements is 500 tonnes per day 1500 tonnes per day 1000 tonnes per day 2000 tonnes per day 500 tonnes per day 1500 tonnes per day 1000 tonnes per day 2000 tonnes per day ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Los Angeles testing machine is used to conduct Impact test Attrition test Crushing strength test Abrasion test Impact test Attrition test Crushing strength test Abrasion test ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Equivalent factor of passenger car unit (PCU) for a passenger car as per IRC is 2.0 0.5 1.0 10 2.0 0.5 1.0 10 ANSWER DOWNLOAD EXAMIANS APP