Highway Engineering In the penetration macadam construction, the bitumen is Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted None of these Premixed with aggregates and then spread ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ? traverser scotch block triangle turntable traverser scotch block triangle turntable ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In case of hill roads, the extra widening is generally provided fully on the outer side of the curve fully on the inner side of the curve one-fourth on inner side and three-fourth on outer side of the curve equally on inner and outer sides of the curve fully on the outer side of the curve fully on the inner side of the curve one-fourth on inner side and three-fourth on outer side of the curve equally on inner and outer sides of the curve ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Los Angeles testing machine is used to conduct Abrasion test Attrition test Impact test Crushing strength test Abrasion test Attrition test Impact test Crushing strength test ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is known as design capacity ? basic capacity theoretical capacity practical capacity possible capacity basic capacity theoretical capacity practical capacity possible capacity ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at 7.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 5.0 mm penetration only 2.5 mm penetration only 7.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 5.0 mm penetration only 2.5 mm penetration only ANSWER DOWNLOAD EXAMIANS APP