Highway Engineering In CBR test the value of CBR is calculated at 5.0 mm penetration only 2.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 7.5 mm penetration only 5.0 mm penetration only 2.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 7.5 mm penetration only ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment given is Prime coat Seal coat Tack coat Spray of emulsion Prime coat Seal coat Tack coat Spray of emulsion ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the design of super elevation for mixed traffic conditions, the speed is reduced by 15% 25% 20% 75% 15% 25% 20% 75% ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering On a right angled road intersection with two way traffic, the total number of conflict points is 18 6 24 11 18 6 24 11 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Bottom most layer of pavement is known as base course subgrade wearing course sub-base course base course subgrade wearing course sub-base course ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Tie bars in cement concrete pavements are at contraction joints longitudinal joints expansion joints warping joints contraction joints longitudinal joints expansion joints warping joints ANSWER DOWNLOAD EXAMIANS APP